EMAC Resource Readiness

Build a Mission Ready Package Before You Need It.

Document your deployable resource now - its people, equipment, capabilities, logistics, and estimated costs - so your organization can respond with confidence when assistance is needed.

An MRP is not a deployment commitment. It is a ready-to-use description of a resource your organization may be able to provide through EMAC.

01 Prepare Define the resource, mission capability, personnel, equipment, logistics, and anticipated costs.
02 Build Document the complete resource package in MASS or the MRP Excel workbook.
03 Validate Confirm the package is operationally sound, financially accurate, and ready to deploy.
04 Maintain Keep personnel, equipment, rates, costs, and deployment requirements current.
05 Offer Maintain your MRP in MASS so it is ready to submit as an offer.

Why build now?

Save time when time matters most.

During an emergency, your team should be deciding whether it can deploy, not trying to assemble critical resource information from scratch. A Mission Ready Package brings that information together before an incident occurs, so your organization can respond quickly and deploy with confidence when assistance is needed.

Decision point Without a prepared MRP With a prepared MRP
Resource details Determine personnel, equipment, and capabilities during the incident delaying your response. Start with a defined, deployable capability that is ready to deploy.
Cost estimates Learn about eligible expenses, calculate personnel, equipment, travel, lodging, and other anticipated costs under pressure. Start with estimated costs that can be quickly reviewed and updated for the mission.
Operational needs Work through qualifications, transportation, logistics, rotations, and support needs during the incident. Know what the resource and personnel need to deploy safely and effectively.
Ready to Offer Spend valuable time gathering information and resolving details before an offer can be made. Confirm availability, update mission-specific details, and move quickly to an offer.

Respond Faster

Start with a defined resource package so you can quickly respond to a request and submit an offer.

Deploy with Confidence

Plan personnel, equipment, qualifications, logistics, rotations, and deployment requirements before the mission.

$

Protect Reimbursement

Understand eligible expenses and documentation requirements, estimate mission-related costs, and improve cost visibility before deployment.

Know what to prepare

What goes into a Mission Ready Package?

An MRP defines a specific mission or capability and captures what is needed to deploy it for a defined period of time - including personnel, equipment, logistics, operational requirements, limitations, and estimated costs.

Before you begin, gather the right information.

Building an MRP is a team effort. You may need information from across your organization to build a complete and accurate MRP. Work with the appropriate operations, finance/administration, personnel, and logistics staff to gather the information you need.

  • Mission capability and deployment requirements
  • Personnel, qualifications, rates, and rotations
  • Equipment, rates, and operational requirements
  • Travel and logistical requirements
  • Estimated mission-related costs
  • Operational limits, support needs, and readiness timeline

MASS organizes every Mission Ready Package into 10 sections. Explore each section below to understand what information you will need to prepare before building your MRP.

01 MRP Details Define the resource, its mission capability, and what it needs to deploy.

Start with a clear description of the resource and the mission it can perform so Requesting and Assisting States can understand the capability being offered.

MRP title, Resource Provider or agency, physical location, and tracking information, if applicable.
Jurisdictional classification, discipline, and FEMA Core Capability.
Mission capabilities, resource description, specialized skills, and important resource features.
NIMS resource type and job positions or qualifications, when applicable.
Hours until ready to deploy and maximum deployment duration.
Limiting factors that could affect deployment or operations.
Logistical support, staging, space, and operational requirements.
i

NIMS alignment is encouraged, but it is not required. If no national resource type or job position/qualification matches your resource, describe it in clear, simple, thorough language consistent with NIMS resource-typing principles. If you believe a national resource type or qualification is needed, let us know.

02 Point of Contact Identify who is responsible for the MRP and how they can be reached.

Provide dependable contact information for the person responsible for the resource and its Mission Ready Package.

Primary contact name and email address.
Work and mobile telephone numbers.
24-hour emergency contact number.
Preferred method of contact.
03 Travel Estimate how personnel will travel, lodge, and sustain themselves during the mission.

Develop realistic travel assumptions for the resource. Estimates can be updated once an actual mission location and duration are known.

Personal, rental, or government vehicle costs.
Airfare and associated travel fees.
Meals or applicable per diem.
Lodging and anticipated number of nights.
Parking, tolls, ride share, taxis, and related transportation costs.
Applicable jurisdictional or state travel policies and assumptions.
i

Your deployment destination may not be known when the MRP is created. Use reasonable planning assumptions and update travel costs when the package is used for a specific mission.

04 Personnel Define who is needed, how they will work, and the anticipated personnel costs.

Identify the personnel required to perform the mission, including qualifications, work schedules, rotations, and anticipated personnel costs.

Personnel by position, type, or quantity.
Required licenses, certifications, or professional qualifications.
Regular rates, overtime rates, fringe, and anticipated work hours.
Mission duration and estimated personnel cost.
Shift length, rotation requirements, replacement timing, and overlap.
Personnel roster information when appropriate for the mission.
i

Personnel salary and fringe information may require assistance from your finance or administration staff.

05 Equipment Identify the equipment required to perform and support the mission.

Document the equipment that deploys with the resource and any requirements that affect how it is transported, staged, operated, or supported.

Equipment type, quantity, and mission use.
Configurations, attachments, compatibility, or operational requirements.
Daily or hourly equipment rates.
Applicable jurisdictional, state, or FEMA-approved rate schedules.
Anticipated hours or days of equipment use.
Special operating, security, parking, connectivity, or staging needs.
06 Equipment R&R Plan for maintenance, repair, replacement, rehabilitation, and decontamination.

Consider what the equipment may require during deployment and what may be necessary to return it to service after the mission.

Routine maintenance required during deployment.
Repair or replacement items that may reasonably be anticipated.
Decontamination or rehabilitation requirements.
Estimated costs for anticipated repair and rehabilitation activities.
07 Commodities Identify expendable supplies and consumable items needed for the mission.

Include consumable items that will be used during the mission and need to be replaced as they are consumed.

Mission supplies and expendable materials.
Water, ice, fuel, snacks, or similar consumable items.
Standard kits that can be packaged as a single commodity.
Estimated quantity and cost of each commodity.
08 Other Capture mission-related expenses that do not fit another cost category.

Use this section for anticipated mission-related costs that are not appropriately captured under travel, personnel, equipment, or commodities.

Mobile phone or communications fees.
Laundry or similar deployment support expenses.
Shipping or transportation of equipment and supplies.
Vaccinations or inoculations required for the mission.
Leased equipment.
Other reasonable and mission-related costs not captured elsewhere.
09 Cost Estimate Review the complete estimated cost of deploying the resource.

MASS brings together the costs entered throughout the MRP to provide a planning estimate for the mission.

Travel costs.
Personnel costs.
Equipment costs.
Equipment repair and rehabilitation costs.
Commodity and other mission-related costs.
Total estimated mission cost.
i

An MRP is a planning estimate. Costs should be reasonable, eligible, mission-related, and consistent with applicable jurisdictional or state policies. Actual reimbursement still requires appropriate documentation and review.

10 Federal Funding Identify federal investments that helped build or sustain the capability.

If federal funding supported elements of the Mission Ready Package, identify the applicable funding programs so those investments in deployable mutual-aid capabilities can be reported.

Identify applicable federal preparedness or homeland security programs.
Select all funding sources that contributed to elements of the capability.

Confirm the resource can be deployed.

Before developing an MRP, work with your State Emergency Management Agency to confirm that the resource can be legally deployed through intrastate or interstate mutual aid.

Choose your build path

Start where your team works best.

There are two ways to develop a Mission Ready Package. Build and maintain your MRP directly in MASS whenever possible. If your team needs an offline starting point, use the standard Excel workbook and upload the completed MRP to MASS.

1
Build your MRP Build directly in MASS or use the Excel workbook as an offline starting point.
2
Maintain it in MASS Keep the completed MRP current, publish it to your state, and make it available for EMAC use.
Recommended

Preferred path

Build and maintain your MRP in MASS.

MASS is EMAC’s free online inventory for Mission Ready Packages and the preferred place to create, review, maintain, publish, and use your MRP.

  • Build your complete MRP online.
  • Keep personnel, equipment, logistics, and estimated costs current.
  • Publish your completed MRP to your state for visibility and review.
  • Once approved, your EMAC Coordinator can publish the MRP to EMAC for nationwide visibility.

Offline starting option

Start with the Excel workbook, then upload to MASS.

Use the standard workbook when your organization needs to gather information offline or complete an internal review before working in MASS. Excel helps you prepare the package; MASS is where the finished MRP should be maintained.

  • Gather and organize resource information with your internal team.
  • Complete one current, standardized MRP workbook.
  • Review the capability, costs, logistics, and deployment assumptions.
  • Import the completed package into MASS for ongoing maintenance and use.

Excel is the starting point—not the final destination.

Upload every completed Excel MRP to MASS so it can be maintained, published to the state inventory, and considered for national EMAC visibility through your EMAC Coordinator.

MASS is the operational home for your completed MRP.

Publishing an MRP to your state makes it available for state visibility and review. Your EMAC Coordinator can then publish the approved MRP to EMAC, where it can be visible to state emergency management agencies nationwide. Being listed in MASS does not mean a resource is automatically available. Availability is confirmed by the Assisting State and Resource Provider at the time assistance is requested.

Interactive MASS Walkthrough

Learn MASS by building an MRP.

Follow the MRP-building process step by step. The walkthrough follows the same tabs you will use in MASS and explains what information to enter, what to consider, and why it matters.

Keep it mission ready

An MRP only saves time if it stays current.

Your MRP should reflect the resource you can actually provide today. Keep it current so the information used for planning, resource matching, and an offer of assistance is accurate when it matters.

Review every MRP at least twice each year.

NEMA recommends a semi-annual review to maintain accuracy and operational readiness. Review sooner whenever personnel, equipment, rates, policies, capabilities, or deployment requirements change.

👥

Update people

Confirm contacts, staffing, qualifications, licenses, rotations, work schedules, pay rates, overtime, and fringe.

Update equipment

Confirm availability, quantities, approved rates, configurations, transport needs, maintenance, and rehabilitation requirements.

$

Update costs

Refresh personnel, travel, lodging, meals, equipment, commodities, and other mission-related cost assumptions.

Apply lessons learned

Update the MRP after exercises, deployments, policy changes, or operational reviews that identify better planning assumptions.

i

Published does not mean automatically available.

Publishing an MRP makes the capability visible for planning and resource matching. When assistance is requested, the Assisting State and Resource Provider still determine whether the resource is available and can deploy for that mission. Non-state resources deploying through EMAC must have an enabling mechanism (legislation, MOU/MOA, intergovernmental agreement, Governor executive order, etc.) that allows the personnel to deploy as temporary agents of the state.

Quick MRP review checklist

Ask one simple question during every review: Does this MRP still describe the resource we could offer today?

  • Confirm the resource can still be legally deployed through mutual aid.
  • Verify the resource description, mission capability, discipline, readiness, and limiting factors.
  • Confirm the primary MRP contact and 24-hour emergency contact information.
  • Review personnel qualifications, staffing assumptions, work schedules, and rotations.
  • Verify current personnel, equipment, travel, and other approved rates and cost assumptions.
  • Confirm equipment requirements, operational restrictions, maintenance, repair, and rehabilitation needs.
  • Update logistical support, transportation, staging, space, and other deployment requirements.
  • Apply lessons learned from exercises and real-world deployments.

 

 

 

 